OMA Power Project gas-fired power plant

OMA Power Project

A multi-phased gas-fired power project for Nigeria’s growing electricity demand.

OMA Power is a greenfield gas-fired power plant in Abia State, co-developed by Geometric Power and General Electric of the USA to support power generation capacity in Nigeria.

Project Type

Gas-Fired Power

Location

Abia State

Target Capacity

1080MW

Project Overview

Geometric Power and General Electric are co-developing a major power generation asset in Abia State.

Geometric Power Limited, GP, a Nigerian independent power producer, and General Electric, GE, of the USA are co-developing the OMA Power Project, a multi-phased greenfield gas-fired power plant in Abia State, Nigeria.

GP and GE bring local expertise, technical competence, and financial strength to the project development, financing, and operation. The partnership responds to Nigeria’s power shortage and the government’s incentives to attract investment in power generation assets.

Project Scale

A three-phase greenfield facility designed for future expansion.

The OMA Power Project is planned as a three-phase greenfield 1080MW facility located in Abia State, Nigeria.

The first phase is a 500MW gross simple-cycle facility driven by General Electric Frame 9 turbines, a proven technology. It has an option for expansion and upgrade to a 1080MW combined-cycle facility in subsequent phases.

Phase One

500MW

Gross simple-cycle facility.

Full Facility

1080MW

Combined-cycle expansion target.

Technology

GE

Frame 9 turbine technology.

OMA Power gas-fired facility

Strategic Partnership

Combining local experience with global power-sector expertise.

GE

General Electric

Incorporated in 1892, GE is a diversified technology and financial services company. GE is globally acclaimed in the power industry and has committed to supporting power development in Nigeria.

GP

Geometric Power

Incorporated in 2000, Geometric Power is an indigenous company with proven experience in the provision of electric power. GP develops, owns, and operates power generation and distribution assets in Nigeria.

Geometric Power and General Electric partnership

Fuel and Power Delivery

Natural gas-powered generation for grid supply.

The plant will run on natural gas, supported by the availability of gas in the region, which is situated a short distance from the Niger Delta.

The facility is designed to supply power through the national grid, delivering its output to customers and supporting Nigeria’s broader electricity needs.

01

Natural Gas

Fuelled by gas resources within reach of the project location.

02

Grid Supply

Output planned for delivery through the national grid.

03

Expansion

Designed with future upgrade to combined-cycle capacity.

Gas-fired power infrastructure

Responding to National Demand

Supporting Nigeria’s need for dependable electricity generation.

Electricity is widely accepted as a basic necessity of life, needed for domestic, commercial, and industrial purposes.

The high and growing demand for electric power in Nigeria has led businesses and individuals to frequent generator use. As an independent power producer, Geometric Power identified an opportunity to provide electric power to the national grid to boost supply and help meet consumption needs.

01

Domestic Use

02

Commercial Use

03

Industrial Use

Project Summary

A power generation project designed for scale, reliability, and economic need.

Project Name

OMA Power Project

Project Type

Greenfield Gas-Fired Power Plant

Location

Abia State, Nigeria

Co-Developers

Geometric Power and GE

Phase One

500MW Gross Simple Cycle

Expansion Target

1080MW Combined Cycle

OMA Power Project

Power generation for national supply and economic growth.

Explore more Geometric Power projects or learn about our integrated approach to power development.